6 production wells in total are being planned to be drilled in OB-92 location which being opened in our license area. With the drilling of the planned wells, the maximum number of geothermal wells in a location in Turkey will be realized by GÜRMAT. With the completion of the 100th well, the total length of the drilling in our license area will be above 210.000 m.